VERA OSTROWSKI
- ROLE
- FOUNDING PARTNER — STRUCTURE
- BORN
- 1974, KATOWICE PL
- TRAINED
- TU WIEN, DIPL.-ING. 1999
- POURED
- 19,400 T
“IF IT CAN ROT, IT IS NOT A MATERIAL.”
ARCHITECTURE COLLECTIVE — FILE BRUTA/00 — SHEET 01 OF 05
WE BUILD IN RAW CONCRETE.
NOTHING ELSE.
SINCE 2009.
SIX CLAUSES. NON-NEGOTIABLE.
CONCRETE IS NOT A FINISH. IT IS THE BUILDING.
WE DO NOT DECORATE. WE POUR. THE FORMWORK IS THE ONLY DRAWING WE TRUST.
NO CLADDING. NO PAINT. NO PLASTER. NO APOLOGY.
A WALL IS 400 MILLIMETRES THICK OR IT IS A CURTAIN.
WEIGHT IS HONESTY. LIGHTNESS IS MARKETING.
EVERY SURFACE REMEMBERS ITS MOULD. WE MAKE THE MEMORY WORTH KEEPING.
RATIFIED 2009-03-12, KÖPENICKER STR. 48 · AMENDED: NEVER · SIGNATORIES: 3 OF 3
FOUR STRUCTURES ON RECORD. 45,120 TONNES COMBINED.
RESIDENCE, GRISONS CH — SINGLE-POUR DWELLING CAST IN 27 CONTINUOUS HOURS. BOARD-MARKED SPRUCE FORMWORK, 400 MM SHELL, NO EXPANSION JOINTS.
CULTURE HALL, GENK BE — ASSEMBLY HALL PINNED 22 M INTO A COAL SLAG HEAP. BLACK-PIGMENTED MIX, ROUGH OAK BOARDS, 900-SEAT CHAMBER.
CIVIC ARCHIVE, HAMBURG DE — 1912 GRAIN SILO RE-CORED AS A CLIMATE ARCHIVE. NEW 9,120-TONNE INNER DRUM POURED INSIDE THE OLD SHELL.
MARKET HALL, LYON FR — 190 M CLEAR-SPAN HALL OVER THE OLD FOUNDRY YARDS. BASALT-AGGREGATE MIX, STEEL PAN FORMWORK, POUR 14 OF 22 COMPLETE.
NINETEEN EARLIER STRUCTURES HELD IN THE PAPER ARCHIVE, HOF III. VIEWING BY APPOINTMENT. GLOVES PROVIDED.
FOUR RECIPES IN ACTIVE SERVICE. CUBES KEPT THIRTY YEARS.
| MIX | NAME | CEMENT | W/C | FORMWORK | 28-DAY | POURED AT |
|---|---|---|---|---|---|---|
| MIX-01 | ROH | CEM I 52.5 R | 0.38 | SAWN SPRUCE BOARDS | 61 N/mm² | MONOLITH 09 |
| MIX-04 | GRAU | CEM III/B 42.5 N | 0.42 | PHENOLIC PLY, OILED | 55 N/mm² | SILO KAPPA |
| MIX-06 | SCHWARZ | CEM II/A-S + 3% OXIDE | 0.40 | ROUGH OAK, RE-USED ×9 | 58 N/mm² | TERRIL HOUSE |
| MIX-09 | SCHWER | CEM I 42.5 + BASALT AGG. | 0.36 | STEEL PANS, GROUND | 74 N/mm² | HALLE BÉTON |
ALL MIXES POURED ON SITE. NO PRECAST. NO ADMIXTURE WE CANNOT PRONOUNCE. TEST CUBES SHELVED IN HOF III, ROWS R001–R118.
THREE PARTNERS. NO STAFF. THE COLLECTIVE DOES NOT HIRE.
“IF IT CAN ROT, IT IS NOT A MATERIAL.”
“THE MOULD IS THE BUILDING’S FIRST LIFE. I BUILD EVERYTHING TWICE.”
“PEOPLE SAY HEAVY LIKE IT IS A PROBLEM.”
COMBINED POUR RECORD: 45,120 T. RECONCILES WITH SHEET 02 TO THE TONNE. WE COUNT.
WE ANSWER IN 48 HOURS. WE BUILD IN DECADES.
BUILD
HEAVY.
BRUTA GbR
KÖPENICKER STR. 48, HOF III
10179 BERLIN, DE
52.51°N 13.42°E
FIELD@BRUTA.WORKS
+49 30 555 0184
07:00–19:00 CET, MON–SAT
SITE VISITS BY APPOINTMENT.
HARD HATS PROVIDED.
BRING A BRIEF, NOT A MOODBOARD.